|
|
|
Catastrophic failure investigation
|
Catastrophic Failure Investigations of BE1370 (DRE3) dragline and Bucket Wheel Reclaimer at BMA. This led to conducting structural risk assessments and the development of comprehensive risk management strategies to secure the entire BMA dragline fleet (33 draglines).
|
 |
 |
 |
 |
Catastrophic failure investigation of the stacker/reclaimer at DBCT. Following the investigations, Structural Integrity Management Strategies
were developed and implemented for all machines at the terminal. |
|